Just a small update on my build. Spoke to Greg at Vintage today. He says my frame and body go to the suspension shop Feb. 1. The body will be temp. mounted to the frame and mock-up engine connected to my transaxle will be installed too. I believe the suspension shop will be making the assembly jig for the frame and suspension for future builds as well.............Bruce
Attachments
Original Post