Skip to main content

Reply to "Convertible top and tonneau cover"

These times are what it takes me with a lot of experience doing speedster tops. Install body snaps 1 hr.   Fit metal bows & tension handles, install snaps, prep header bow add two latches, glue top to header bow. 5 hrs. Install top flap snaps to windshield frame 3/4 hrs. Install snaps to quarter tonneau cover & two strap snaps to lower tub wall 1-1/4 hrs. Install side curtain post sockets 1-1/4 hrs.  Side Curtain safety straps snaps to door top rails.  3/4 hrs.   ....  About 10 hours

Last edited by Alan Merklin
×
×
×
×
×