Skip to main content

Reply to "Head Stud Problem"

Yeah, you're going about it the right way, Bobby. You want the arms to be at 90 degrees to the valve at half lift. Get the geometry set up first, then shim for side movement (003-.005"?) and then measure pushrod length. Gene Berg Ent. (and others) sell shims to go underneath the rocker blocks. Al

http://www.geneberg.com/produc...&products_id=175

Last edited by ALB
×
×
×
×
×