Skip to main content

Reply to "My New Speedster! Street Beast / Innovative Street Machines"

Things that need to be done:  SB has the kick panels inboard of the 2 x 4 steel box frame , they need to be moved using sheet metal to the outer -wheel well side on the steel frame to allow for a wider foot well and so that your left foot can operate the clutch safety. The donor rear torsion assembly is secured with two 2" clamps, best to have the torsion welded to the SB "frame".

Last edited by Alan Merklin
×
×
×
×
×