Skip to main content

Reply to "Thunder Ranch build thread"

Well, it was slow going until this afternoon. Suddenly, in three hours, I got both front fenders wells, side tub walls, front floor bits fitted. I was working so smoove I only took like three pictures, none worth sharing.

The plan now is to get the rest of the tub parts done—the floors under the seats, the box sections ahead of the bulkhead (with the last oval hole), the (inside) firewall and insides of the doors and maybe bond them in on Tuesday, since it's supposed to be warm. 

Then it's down to the outside firewall and underbelly, plus a bit of adjusting, and I'll be basically done with the aluminization project.

—at which time I can actually begin what we usually refer to as "assembly."

Very stoked indeed.

×
×
×
×
×